Startseite » Latest Info

Latest Info

The Underground lift … easy maintenance

The underground installation of the installation core of a lubrication system is beautiful and convenient but uncomfortable in maintenance. We have now developed the new model with underground lift for more convenience during maintenance and servicing: The installation core is placed in an underground steel box. The installation core is electro-hydraulically lifted to approximately 1 meter above ground level for maintenance works.

The steel box is locked with a watertight cover which can be covered e.g. with cobblestone pavement. The installation of a rail lubrication system also in historical centers and under strict urban development standards no longer poses any real problem.

Inspection box for the covered area with watertight cover

This box is suited particularly for the construction of the lubrication path in available track systems. The watertight cover prevents the penetration of precipitation in a way that renders the complex connection with the drainage system unnecessary.

Go to Top